When finished adding tasks relative to that date, set the editing date back to the present. This changes the contextual “insertion point” for the project to that date-newly created tasks originate there by default. To schedule a task that has (or should have) already happened, choose Project ▸ Set Current Editing Date and enter the date when work on the task began. A locked date (Start, End, or both) will not be affected by leveling.

omniplan scheduling

Resource availability is not taken into consideration, so resources may end up overutilized (this is why leveling is an important additional step).Ī task can also be scheduled As Late As Possible ( ALAP), which defers it until the latest possible time based on other constraints.Ī task’s Start and End dates can be defined as temporally immovable by locking them (with the lock icons above the Start and End date fields in the Schedule section of the Task inspector, or by holding Command and clicking either end of the task’s bar in the Gantt chart). This means the task is placed at the very earliest time possible, taking into consideration start and end constraints, and dependencies on other tasks. The Task inspector’s Scheduling method indicates how OmniPlan should determine when a task is to occur in the project.īy default and prior to leveling, new tasks are scheduled as early as constraints allow (“As Soon As Possible”, or ASAP).













Omniplan scheduling